Project: JoshBGL   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Isaac Faibisoff   -  
Project:   Plans Baby Great L   -   VIEW REPORTS
Total Hours:6.8
Total Flight Time:
Total Expense:N/A
Start/Last Date:Jan 03, 2011 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=JoshBGL

Home or Last Project Picture

Aug 30, 2021     Rudder pulleys - (1 hour)       Category: Controls
Tack welded bushings for rudder pulleys that go underneath the seat.


 
Aug 23, 2021     Rudder pulleys - (2 hours)       Category: Controls
On 8/23 an 8/29. Tack welded pulley brackets in place for the rear most rudder pullies.


 
Aug 15, 2021     Pulley assembly sta 22.25       Category: Controls
Tack welded assy in place


 
Aug 13, 2021     Pulley assembly sta 22.25       Category: Controls
Fit assembly in place


 
Aug 12, 2021     Pulley assembly sta 22.25 - (.8 hour)       Category: Controls
Continued to shape brackets


 
Aug 11, 2021     Pulley assembly sta 22.25 - (.5 hour)       Category: Controls
Used belt sander to final shape bracket for pulley assembly at station 22.25


 
Aug 09, 2021     Pulley assembly sta 22.25 - (0.5 hour)       Category: Controls
Rough cut the brackets for the pulley assembly at station 22.25 out of 0.65 plate


 
Aug 04, 2021     Pulley assembly station 22.25 - (1 hour)       Category: Controls
Redesigned the bracket for the pulley assembly at station 22.25 so that the down elevator cable would clear the pulley axle


 
Jul 08, 2021     Front pulleys rudder and down elevator - (1.0 hour)       Category: Controls
Rough fit bracket for pulleys in place.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.