EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
wbolan
-
Last 30 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (167)
Research
Workshop
- (1)
Empennage
- (11)
Fuselage
- (53)
Firewall
- (14)
Tail Feathers
- (8)
Wings
Controls
- (6)
Avionics
- (18)
Lighting
Instrument Panel
- (5)
Landing Gear
- (7)
Engine
- (29)
Propeller
- (2)
Fuel System
- (1)
Interior Finish
- (5)
Paint / Decals
- (3)
Inspection
- (4)
Tools
Builder Name:
Walter Bolan
-
Project:
Bearhawk - 4 Place
-
VIEW REPORTS
Total Hours:
1094
Total Flight Time:
Start/Last Date:
Nov 05, 2021 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=wbolan
Home or Last Project Picture
Apr 06, 2024
More finishing work
- (14 hours)
Category: Fuselage
Cindy made some templates for the landing gear fairing. Started forming the landing gear fairing. Mounted the 2nd seatbelt bracket. Drilled holes in windshield fairing and made some brackets for the back of the window. Put in nut plates for the brackets and windshield fairing. Glued some aluminum to the wing root covers to mount the fuel sight gauges. Made up the 2nd sight gauge. Install sight gauges
PXL_20240330_232740333.jpg
PXL_20240404_224313568.PORTRAIT.jpg
PXL_20240405_045917264.jpg
PXL_20240406_043749415.jpg
PXL_20240407_103522710.jpg
PXL_20240407_103533464.jpg
Mar 30, 2024
Seatbelts, windshield fairing cowl door fasteners
- (16 hours)
Category: Fuselage
Test fit seatbelt brackets, removed and primed and painted. Received new camlocs from skybolt, adjustable receptacle. Installed on cowl doors and adjusted. Also kept sanding and filling on windshield fairing. Made up sight gauges using 1/2 aluminum tubing and cutting off an edge and installed tubing and 90degree elbows.
PXL_20240330_071829143.jpg
PXL_20240330_083221941.jpg
PXL_20240330_232740333.jpg
Mar 23, 2024
windshield seatbelts
- (10 hours)
Category: Fuselage
Installed windshield. Created fiberglass fairing for windshield with help from Cindy, still finishing. Mounted seatbelt brackets. Still figuring out camloc situation.
PXL_20240330_232740333.jpg
PXL_20240322_005722168.jpg
PXL_20240322_005726595.jpg
PXL_20240322_005732669.jpg
Mar 16, 2024
Windshield seat belts
- (6 hours)
Category: Fuselage
Drill windshield. Installed nut plates for windshield attachment. Took in parts to get welded for seat belt attachments.
Mar 09, 2024
Engine/windshield seatbelts
- (9 hours)
Category: Fuselage
Installed anti splat crankcase breather tube to exhaust. Drilled pilot holes for windshield mounting. Received seat belts, worked on way to mount inertial reels.
Cut template for wing root to reference windshield
Safety wire brake calipers.
PXL_20240308_052246520.jpg
PXL_20240308_052249848.jpg
Feb 24, 2024
fuselage/engine work
- (8 hours)
Category: Fuselage
Tap seatbelt mounting holes for pilot seat. Ordered seat belts. Tried a different position for ap roll servo, did not find a better spot, ordered some different bearings. Applied fireseal around engine baffles, and wire pass thru. Rerouted oil cooler line but may need a little longer line.
Feb 17, 2024
Inspection
- (2 hours)
Category: Inspection
Talked with a local A&P Daryl Dasher and he came out to look over my work and offer any pointers. Looked good, gave me some more things to tidy up and advice on doing things
Feb 16, 2024
More wire tidying
- (6 hours)
Category: Engine
Spent time clamping wires and wrapping wires. adjusting anything that might be rubbing and rerouting items
Feb 10, 2024
Wiring/ Wing root
- (18 hours)
Category: Fuselage
Finished the kydex panels for the wing root. Added the elt switch. Adjusted the rack for the electronics since the engine controls were rubbing. Tidy the wiring, got it all laced.
PXL_20240128_093214098.jpg
PXL_20240210_034715993.jpg
PXL_20240210_034718938.jpg
PXL_20240210_034729640.jpg
PXL_20240211_123153701.jpg
PXL_20240211_123156449.jpg
Feb 02, 2024
Engine/ wing root panels
- (12 hours)
Category: Engine
Started working on the wing root panels out of kydex. Also made a bracket for the elt switch that will mount one the wing root. Installed rivnuts for the kydex to attach to. Install scat tubing for the carb heat and cabin heat.
Jan 27, 2024
Wiring
- (10 hours)
Category: Avionics
Started organizing wires around the engine compartment. Ran wires for the wing lights, nav lights
PXL_20240128_093214098.jpg
Jan 13, 2024
Engine work
- (12 hours)
Category: Engine
Installed a new exhaust stud on cylinder 3, tightened all exhaust nuts to 17ftlbs. Reinstalled egt probes. Hooked up throttle, mixture, prop, carb heat cables. Routed all spark wires. Installed oil cooler duct. Attached baffling ramp baffles. Ran wires for pitot heat.
PXL_20240114_103243064.jpg
PXL_20240114_103246087.jpg
PXL_20240114_103254301.jpg
PXL_20240114_103332971.jpg
PXL_20240114_114923407.jpg
Dec 30, 2023
Cowling and exhuast nut work
- (9 hours)
Category: Engine
Exhaust nuts were not tightening on cylinders 1,2,3,4,5, outside nut. installed helicoils on 1,2,3,5. Cylinder 4 needs a new stud. Installed oil dipstick access hole in top of cowling. Used a spring hinge and lock on door.
PXL_20231231_103623976.jpg
PXL_20231231_103631872.jpg
Dec 16, 2023
Baffles and instrument panel
- (12 hours)
Category: Engine
Got instrument panel back from vinyl store, installed back into plane and installed controls. Installed baffling and riveted in place. Torqued prop governor. Installed baffle rods
Dec 09, 2023
Baffles
- (7 hours)
Category: Engine
Prepped panel for vinyl and dropped off at shop. Started doing baffles seals, got most temporary in place. Engine mount covers in place.
PXL_20231217_072421931.jpg
PXL_20231217_072426266.jpg
PXL_20231217_072429003.jpg
Dec 02, 2023
Engine
- (4 hours)
Category: Engine
Installed gaskets and torqued carburetor and air box. Installed washers and torqued exhaust nuts, outside exhuast nuts for 1,2,3,4,5 would not torque down, need to call Mike and talk to
Nov 18, 2023
Cowling work
- (9 hours)
Category: Empennage
Finished riveting cowling. Got nuplates installed on nose bowl. Cowl doors installed.
PXL_20231119_035814019.jpg
PXL_20231119_035830884.jpg
PXL_20231119_084514302.jpg
PXL_20231119_084521849.jpg
PXL_20231119_084527409.jpg
PXL_20231119_094740106.jpg
PXL_20231119_094744078.jpg
Nov 11, 2023
Instrument panel
- (8 hours)
Category: Instrument Panel
Remove avionics panel to mark out holes for vinyl wrap. Made a reinforced plate to attach the throttle mixture cables on the backside of the panel. Attached nutplates to screw panel to frame. Started riveting top engine cowling.
Nov 04, 2023
Engine items
- (14 hours)
Category: Engine
Made air intake, took a couple of tries to get it good. Installed oil, fuel and manifold hoses. Installed starter and alternator cables. Installed exhaust mufflers, started fitting brackets. Attached carb heat cable.
PXL_20231030_202550215.jpg
PXL_20231105_001330679.jpg
PXL_20231105_061600382.jpg
PXL_20231105_061604127.jpg
PXL_20231105_061610048.jpg
Oct 26, 2023
Air intake
- (6 hours)
Category: Engine
Cut hole in lower cowling for intake, temporarily attached intake scoop, started designing the intake and the filter
PXL_20231026_234915405.jpg
PXL_20231026_234917514.jpg
PXL_20231027_002239925.jpg
PXL_20231030_202514481.jpg
Oct 21, 2023
Engine sensor wiring
- (8 hours)
Category: Avionics
Wired all sensors to the eis. Ran alt field wire to voltage regulator. Made small fuel line from firewall to fuel flow transducer. Ran p-leads to switch, created another hole in firewall. Measured and ordered lines for oil cooler, alt/starter wire, manifold and oil pressure. lines.
Oct 13, 2023
Firewall work
- (6 hours)
Category: Engine
Got the right throttle and mixture cable bracket from vans, need to increase hole size. Wired the oil pressure sensor, started wiring the magneto p leads. Wired the fuel flow transducer.
Oct 07, 2023
More engine work
- (8 hours)
Category: Engine
Drilled holes for throttle mixture, prop. Mixture and throttle cables were to long. Wired tach sensor, manifold sensor. Attach prop governor bracket to baffles. Attached baffle clips.
PXL_20231012_163417543.jpg
Oct 02, 2023
AIr intake
- (1 hour)
Category: Engine
Cut the air scoop to size, next to build box around filter
Sep 23, 2023
Sensors
- (3 hours)
Category: Engine
Installed egt probes, wired CHT , wired oil temp sensor
PXL_20231012_163430122.jpg
Sep 11, 2023
Baffles
- (6 hours)
Category: Engine
Cut baffles to size, installed cht probes, marked out firewall items that need attached, drill hole for wire pass thru. Drilled holes for pressure sensors mount.
PXL_20230911_195834287.jpg
PXL_20230911_195842207.jpg
Sep 10, 2023
More cowling work
- (7 hours)
Category: Fuselage
Finally got back on the airplane after vacations. remade the cowling doors and look much better. Cut all the cowl pieces to the correct length
PXL_20230910_210011432.jpg
PXL_20230910_210018955.jpg
PXL_20230910_222543294.jpg
PXL_20230911_000737671.jpg
PXL_20230911_000744998.jpg
Aug 10, 2023
Exhaust
- (1 hour)
Category: Engine
Cantact Clint at vetterman and talked about the mufflers touching the cowling, had me send back just the mufflers to possibly make them smaller.
Jul 29, 2023
Baffle work, cowling
- (15 hours)
Category: Engine
Spent more time cutting baffles to shape, and worked on the cowling doors, miss drilled some holes in the cowl doors and was not as flush as I would have liked, going to redo them
PXL_20230729_215704858.jpg
PXL_20230729_215707761.jpg
PXL_20230729_233950260.jpg
PXL_20230730_080833751.jpg
PXL_20230730_080839199.jpg
PXL_20230730_080842808.jpg
PXL_20230730_100815452.jpg
PXL_20230730_100821180.jpg
PXL_20230811_201841116.jpg
PXL_20230811_201845077.jpg
PXL_20230812_001100475.jpg
PXL_20230812_045019781.jpg
Jul 25, 2023
Exhaust
- (3 hours)
Category: Engine
Received the exhaust and installed, put on lower cowling and th heat muffs are touching or are really close to the cowling, contacted vetterman to see next steps
PXL_20230726_022106731.jpg
PXL_20230726_022115265.jpg
PXL_20230726_045159302.jpg
PXL_20230726_045320995.jpg
PXL_20230726_045323624.jpg
PXL_20230726_045334538.jpg
PXL_20230726_045341857.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.