EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
BearhawkChief
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (10)
Research
- (1)
Workshop
Empennage
Fuselage
Firewall
Tail Feathers
Wings
- (5)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
- (4)
Builder Name:
Eric Roberts
-
Project:
Bearhawk - "B"
-
VIEW REPORTS
Total Hours:
14
Total Flight Time:
Start/Last Date:
Nov 08, 2021 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=BearhawkChief
Home or Last Project Picture
Nov 15, 2021
Master Sanding Finished
- (1.5 hours)
Category: Wings
Used belt sander clamped to workbench. Sanded to the line.
IMG_0969.jpg
IMG_0970.jpg
Nov 12, 2021
Rib Drill Guides
- (2 hours)
Category: Research
3/16 I.D. Guide Pin holes are preferred. Using "router" cut method requires second guide pin hole (not identified on plans) on each form. Router method is my course forward.
Resource: Bearhawk Forum, Bearhawk Router Method and Bearhawk Build Manual.
Nov 10, 2021
Master Rib Form
- (3 hours)
Category: Wings
Hand sanded master rib form continued.
Nov 08, 2021
Master Rib Form
- (2.5 hours)
Category: Wings
Cut out Mylar rib template. Applied to hardwood with spray adhesive. Rough cut master rib with jigsaw. Best day ever!!!!!
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.