EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
bbellamy
-
Listing for Category : Fuselage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (544)
Milestones
- (4)
Research
- (65)
Workshop
- (1)
Empennage
Fuselage
- (181)
Firewall
- (1)
Tail Feathers
Wings
- (7)
Controls
Avionics
- (269)
Lighting
- (5)
Instrument Panel
- (6)
Landing Gear
Engine
- (2)
Propeller
Fuel System
- (1)
Interior Finish
Paint / Decals
Inspection
Tools
Registration
- (2)
Builder Name:
Brad Bellamy
-
Project:
Vans - RV-7A
-
VIEW REPORTS
Total Hours:
1890.7
Total Flight Time:
Start/Last Date:
Jan 01, 2001 - No Finish Date
Engine:
IO-360
Friendly URL:
https://eaabuilderslog.org?s=bbellamy
Home or Last Project Picture
Jan 31, 2024
Unpacking FWF box part 1
- (.3 hour)
Category: Fuselage
Started unboxing the FWF parts. The exhaust box had been shipped from Vetterman to Van's and had some damage to the bottom. So I opened that box and checked out the parts. Looks like whatever caused the damage to the box didn't reach the parts.
IMG_6253.jpeg
IMG_6254.jpeg
IMG_6255.jpeg
IMG_6256.jpeg
IMG_6257.jpeg
IMG_6258.jpeg
IMG_6259.jpeg
IMG_6260.jpeg
IMG_6261.jpeg
IMG_6262.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.