EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
bellis
-
Listing for Category : Empennage
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (9)
Research
Workshop
Empennage
- (9)
Fuselage
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Ben Ellis
-
Project:
Vans - RV-8
-
VIEW REPORTS
Total Hours:
27.5
Total Flight Time:
Start/Last Date:
Oct 31, 2022 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=bellis
Home or Last Project Picture
Nov 05, 2022
Horizontal Stabilizer Rear Spar Assembly
- (2.5 hours)
Category: Empennage
Final drilled the holes attaching the rear spar reinforcement bars to the rear spar and the holes attaching the elevator hinge brackets to the rear spar. Enlarged the holes connecting the HS-708 main rib to to the rear spar.
unnamed.jpg
unnamed.jpg
unnamed.jpg
unnamed.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.