Project: bellis   -  
            Listing for Category : Empennage
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Ben Ellis   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:27.5
Total Flight Time:
Start/Last Date:Oct 31, 2022 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=bellis

Home or Last Project Picture

Nov 07, 2022     Horizontal Stabilizer Forward Spar Assembly - (2 hours)       Category: Empennage
I bent the HS-810 and HS-814 angles in a vice by sandwiching them between two pieces of square mahogany. I routed a 1/8" radius on the edge of the wood that the angles were bent over to help achieve the radius indicated in the plans and used a cardboard template to check the bend angle as recommended.

I then marked and drilled the #30 relief hole on the forward spar and expanded it to 1/4" with a unibit. I achieved the 5/16" deep notch called for by the instructions, but I noticed that I did not have the edge distance typically required by the MIL-SPEC for one of the rivet holes in each of the doublers. I emailed Vans to get their thoughts and they replied: "This is one location in the aircraft where we have a known short edge distance on a rivet. This rivet was added due to the SB linked below. Your photo looks correct and no corrective action is required. Keep building." So it looks like I did it the right way.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.