Finally back at the build after an illness and very cold weather. First step was to add the piano hinge for the elevator. Cut two 32.5" pieces and lined them up match drilled with the existing holes. The instructions give you guidance for making the holes prior to the test fit, but I decided to mark the length of hinge down the centerline of the holes, and drill that way. Both sides look to be consistent, and the two hinge pieces are interchangeable, indicating they are symmetrical. Happy with how they turned out.
Once that was complete, I test fit the stabilizer skins to the frame. I have not done any rivets yet. Wanted to confirm everything was lining up. Once I was confident I had a good fit, I sank the first rivets today. I started with riveting the ONX-T04-09 to ONX-T04-10. I marked holes as I went to ensure I used the correct rivets in each hole. The painter's tape was not pretty but was an effective way of ensuring I would not use the wrong rivets.
I was happy with the way the Milwaukee rivet gun worked. Nice to not have an air hose in the way, and the rivets were consistent.