Total Hours:46
Total Flight Time:
Total Expense:N/A
Start/Last Date:Dec 06, 2022 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=Cornhawk

Home or Last Project Picture

Feb 04, 2024     Rudder, Tailwheel, and formers - (4 hours)       Category: Tail Feathers
Started back drilling the pilot side door formers, need to up to final size after fuel lines.
Took the fuselage off the rear rotisserie and installed the rudder and tailwheel.


 
Jan 24, 2024     Rigging for Flaps, Trim, and Elevators - (4 hours)       Category: Controls
Finished rigging the elevators and portions of the trim & flap cables


 
Oct 29, 2023     Elevator Control Xables - (2 hours)       Category: Controls
First attempts at swaging control cables and it was heavy on the learning experience. Many failed attempts.


 
Oct 01, 2023     Fuselage Rotisserie - (8 hours)       Category: Tools
Spent the summer dealing with house issues and getting married, quite a pause. Dad and I started back in on things today by getting the fuselage mounted on a rotisserie. Need to move the rotation point down on the rudder post but we'll need a cv joint for that.


 
Apr 03, 2023     Trim Tabs and Static Balancing - (5 hours)       Category: Tail Feathers
We assembled the rest of the trim tabs with pushrods and match drilled the torque tubes with the horn. Filled in the cut sections with epoxy. Did the static balancing for the elevators with the theoretical weight of Oratex6000 and disassembled everything.


 
Feb 19, 2023     Mounting Elevators - (4 hours)       Category: Tail Feathers
Reamed out the elevator mounts and installed the bearings, bellcrank, and trim tube horn. Mounted the stabilizers correctly with a clamp to temporarily hold in position for the rest of the assembly. Cut loose the trim tabs and ground flush but the hardware kit has the incorrect clevis pin diameter so we need to reorder for 3/8".


 
Feb 11, 2023     Horizontal Stabilizers - (5 hours)       Category: Tail Feathers
Unpacked the rear stabilizers and elevators. Leveled the plane to bottom longer on datum reference as well as side to side. Installed front elevator support assembly and confirmed 2 deg offset. Assembled the left rear stabilizer and installed the first rivets on actual project for the trim torque tube bracket…then drilled out the first rivets and reinstalled in correct orientation. Torque tubes required sanding before operating smoothly.


 
Jan 16, 2023     Control Stick Assembly - (1.5 hours)       Category: Controls
Initial alignment and drilling for the control stick assembly and bellcrank


 
Jan 11, 2023     Landing Gear Shocks - (2 hours)       Category: Landing Gear
Assembled landing gear shocks


 
Jan 01, 2023     Door formers - (1 hour)       Category: Fuselage
Drilling out temporary rivets and remaining flanges


 