EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RBHawk
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (37)
Research
- (12)
Workshop
- (11)
Empennage
Fuselage
- (13)
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Auto Entry
- (1)
Builder Name:
Randy Beck
-
Project:
Model 5
Total Hours:
166
Start/Last Date:
Jul 26, 2021 - No Finish Date
Engine:
IO-540
Propeller:
Hartzell 3-blade Trailblazer
Panel:
Dynon
Friendly URL:
https://eaabuilderslog.org?s=RBHawk
Home or Last Project Picture
Mar 30, 2024
Supply - identify non-kit parts/sources for doors/windows, evaluated bonding vs riveting pros/cons
- (6 hours)
Category: Fuselage
We. Search for parts/tools/supplies required for Supply of doors/windows, evaluated bonding vs riveting pros/cons. Researched carbon fiber lay-up methods, tools and supplies required for trim pieces
Mar 29, 2024
Doors and Windows
- (4 hours)
Category: Fuselage
Identified all door and window kit pieces. Test fit cabin and cargo doors and windows. Began research on build approach.
IMG_8860.jpeg
IMG_8859.jpeg
Apr 19, 2023
Completed fitting stringers
- (5 hours)
Category: Fuselage
Measured, cut, trimmed and shaped ends of remaining stringers (3,4,7,8). Still need to drill and pin, determine termination of stringer 8 fwd (L rear window) and aft end of bottom stringers (may go with aluminum skin under tail for accessibility).
IMG_6119.jpeg
IMG_6118.jpeg
Apr 18, 2023
Measure and install top and bottom formers
- (4.5 hours)
Category: Fuselage
Rough measure, rough cut, fit, fine cut, shape ends and temp install top and bottom stringers
IMG_6103.jpeg
IMG_6104.jpeg
IMG_6109.jpeg
IMG_6113.jpeg
IMG_6114.jpeg
IMG_6115.jpeg
Apr 14, 2023
Drill additional holes for tabs, final fit for L pilot sill bracket
- (5.5 hours)
Category: Fuselage
Drill out remaining tabs, make new bracket for L pilot door sill, drill and tempo install remaining door sill formers
IMG_6073.jpeg
IMG_6075.jpeg
IMG_6077.jpeg
IMG_6078.jpeg
Apr 04, 2023
Trim and temp install front floorboard
- (3 hours)
Category: Fuselage
Determine overlap vs butt joint, trim and temp install front floorboard
IMG_6027.jpeg
IMG_6028.jpeg
IMG_6029.jpeg
Apr 03, 2023
Pilot and Copilot door trim
- (6 hours)
Category: Fuselage
Making brackets, backdrilling door trim, checking for clearances, fitting and installing
3B8F9676-2E5E-43BB-9240-5C2BD6E8C705.jpeg
247B5A3F-AB03-41FB-8E72-76275E1A4B37.jpeg
5D606F7C-BC4E-4C19-AD05-04FF7A4BAAA9.jpeg
Mar 30, 2023
Create brackets, drill and temp mount door sill formers
- (6 hours)
Category: Fuselage
Create brackets for L, R front-door sills. Cut, bend on brake, fit, drill and temp install formers
IMG_6021.jpeg
IMG_6019.jpeg
IMG_6020.jpeg
Mar 23, 2023
Temp install front flooring pieces
- (5 hours)
Category: Fuselage
Make adjustments to flooring for tube clearance and minimum gal between floor pieces. Drill to #40 and cleco in place
CC057452-5521-44EA-BCCA-8911B4453588.jpeg
EFEB3FAE-E6B6-4164-84C6-DDE72DDDBCD7.jpeg
9851C461-D71C-4821-88FB-FEACC97E27DA.jpeg
82A725B5-9C7F-4D9F-B5F4-413E63D17CF3.jpeg
4AF2DB4B-C2DA-4532-8DCD-653F8FAE58EF.jpeg
43B50252-8802-43CE-88EE-2DFED747118D.jpeg
Mar 22, 2023
Test fit floor pieces
- (4 hours)
Category: Fuselage
Reviewed floor installation photos, Colin captions, legacy build manual. Determined flooring attachment approache. Made decision to use monadnocks vs nut plates. Test fit floor pieces. Minor adjustments required.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.