Project: RBHawk   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Randy Beck   -  
Project:   Model 5
Total Hours:166
Start/Last Date:Jul 26, 2021 - No Finish Date
Engine:IO-540
Propeller:Hartzell 3-blade Trailblazer
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=RBHawk

Home or Last Project Picture

We. Search for parts/tools/supplies required for Supply of doors/windows, evaluated bonding vs riveting pros/cons. Researched carbon fiber lay-up methods, tools and supplies required for trim pieces
 
Mar 29, 2024     Doors and Windows - (4 hours)       Category: Fuselage
Identified all door and window kit pieces. Test fit cabin and cargo doors and windows. Began research on build approach.


 
Apr 19, 2023     Completed fitting stringers - (5 hours)       Category: Fuselage
Measured, cut, trimmed and shaped ends of remaining stringers (3,4,7,8). Still need to drill and pin, determine termination of stringer 8 fwd (L rear window) and aft end of bottom stringers (may go with aluminum skin under tail for accessibility).


 
Apr 18, 2023     Measure and install top and bottom formers - (4.5 hours)       Category: Fuselage
Rough measure, rough cut, fit, fine cut, shape ends and temp install top and bottom stringers


 
Apr 14, 2023     Drill additional holes for tabs, final fit for L pilot sill bracket - (5.5 hours)       Category: Fuselage
Drill out remaining tabs, make new bracket for L pilot door sill, drill and tempo install remaining door sill formers


 
Apr 04, 2023     Trim and temp install front floorboard - (3 hours)       Category: Fuselage
Determine overlap vs butt joint, trim and temp install front floorboard


 
Apr 03, 2023     Pilot and Copilot door trim - (6 hours)       Category: Fuselage
Making brackets, backdrilling door trim, checking for clearances, fitting and installing


 
Mar 30, 2023     Create brackets, drill and temp mount door sill formers - (6 hours)       Category: Fuselage
Create brackets for L, R front-door sills. Cut, bend on brake, fit, drill and temp install formers


 
Mar 22, 2023     Test fit floor pieces - (4 hours) Category: Fuselage
Reviewed floor installation photos, Colin captions, legacy build manual. Determined flooring attachment approache. Made decision to use monadnocks vs nut plates. Test fit floor pieces. Minor adjustments required.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.