Project: BrettBearhawk   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Brett Fiedler   -  
Project:   Bearhawk - "B"   -   VIEW REPORTS
Total Hours:65
Total Flight Time:
Start/Last Date:Mar 05, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=BrettBearhawk

Home or Last Project Picture

Apr 05, 2023     Fuselage start - (15 hours)       Category: Fuselage
Wings are stored upright and out of the way in their original shipping crates. I also went through the process of adding an extension for the table. So now my full work table is 8+8+2 for 18 feet. Basically 17.5 ft are required for the Bearhawk (203 inches).

I leveled the table using the adjustable feel I have and an electronic level. I also snapped a center line and started drawing the horizontal cross member locations. Im working under the assumption that my vr3 tubing kit is basically self jigging. I'm not constraint the tubes except for where needed

I found out my tubing kit does not have the lowered window frame tubes for the “bravo” wings. I'll either reach out to vr3 for a fix or just order tubes and cut it myself.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.