With the airframe parts assembled and the work table disassembled for storage the fuselage need to be moved to a larger space to attach the wings, jury struts, and the cabane struts. I built a spar to go in the main gear attachment channel area. Using an engine lift I attached the spar and a rolling dolly to the Fuselage. I attached a sling to the cabin frame at the front spar carry thru. With the help of my friend Jerry we rolled it out of the work shop. We then lifted it with a tractor and sling, on to a trailer and move the whole thing to the barn to a platform I had built earlier. Tractor again lifted the fuselage from the trailer and on to the platform. Next we leveled the fuselage and the platform were with my smart tool digital level.