EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
N741BN
-
All Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (45)
Research
- (3)
Workshop
- (6)
Empennage
- (25)
Fuselage
Firewall
Tail Feathers
Wings
- (3)
Controls
Avionics
- (1)
Lighting
Instrument Panel
Landing Gear
Engine
- (6)
Propeller
- (1)
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Auto Entry
Builder Name:
Michael Slevin
-
Project:
Zenith CH 750 SD
Total Hours:
216
Start/Last Date:
Sep 12, 2023 - No Finish Date
Engine:
Viking 195T
Propeller:
Duc FLAIR VIP 5 Blade
Panel:
Garmin G3X
Friendly URL:
https://eaabuilderslog.org?s=N741BN
Home or Last Project Picture
Apr 07, 2024
Right Wing
- (8 hours)
Category: Wings
Finished initial assembly / mock up of spar and rib assemblies of right wing, disassemble and debur prep for primer.
IMG_3033.jpeg
IMG_3034.jpeg
IMG_3032.jpeg
IMG_3029.jpeg
Apr 06, 2024
Right Wing
- (5 hours)
Category: Wings
Started initial assembly of right wing
IMG_1799.jpeg
IMG_1802.jpeg
Mar 30, 2024
Mock up engine sensors
- (4 hours)
Category: Engine
Installation mock up of engine sensors
IMG_3006.jpeg
IMG_3005.jpeg
IMG_3004.jpeg
IMG_3003.jpeg
IMG_3002.jpeg
IMG_2999.jpeg
IMG_2998.jpeg
IMG_2997.jpeg
IMG_2995.jpeg
Mar 29, 2024
Duc Propeller arrives
- (1 hour)
Category: Propeller
Prop arrives inspect and inventory. Expense included in FWF kit.
IMG_1749.jpeg
IMG_1751.jpeg
IMG_1758.jpeg
Mar 23, 2024
Start wings
- (4 hours)
Category: Wings
Parts search, store HS and elevator. Mock up first page wing plans spar. Wing rack from Gary added wheels.
IMG_3014.jpeg
IMG_3012.jpeg
Mar 14, 2024
Engine arrives and FWF kit arrives
- (6 hours)
Category: Engine
Receive and inventory engine and firewall forward kit.
IMG_1712.jpeg
IMG_1713.jpeg
IMG_1715.jpeg
IMG_1716.jpeg
IMG_1717.jpeg
IMG_1719.jpeg
Mar 11, 2024
EAA Electrical and Avionics
- (16 hours)
Category: Workshop
Traveled to San Jose CA for EAA workshop. Was some of the best training I ever received great instruction. March 8-11 2024. Costs with travel $1200.
IMG_3008.jpeg
Feb 15, 2024
Engine Sensors ordered
- (1 hour)
Category: Engine
Feb 05, 2024
Viking Worksop
- (8 hours)
Category: Workshop
Flew to Florida for Viking Aircraft Engines for the annual workshop and ordered my Viking Honda 195 Turbo.
IMG_1666.jpeg
IMG_1639.jpeg
IMG_1638.jpeg
IMG_1640.jpeg
Jan 28, 2024
Trim tab install & final mock up
- (12 hours)
Category: Empennage
Install and calibrate trim tab range of motion, complete mock up installation of horizontal stabilizer with end fences, elevator, and trim tab. Fab & Install doubler for trim tab slot in skin due to oil canning. Contact Marv Scott for EAA consult on Tuesday.
IMG_2770.jpeg
IMG_2771.jpeg
IMG_2772.jpeg
IMG_2773.jpeg
IMG_2774.jpeg
IMG_2776.jpeg
IMG_2777.jpeg
IMG_2778.jpeg
IMG_2779.jpeg
IMG_2781.jpeg
IMG_2782.jpeg
IMG_2783.jpeg
IMG_2784.jpeg
IMG_2785.jpeg
IMG_2786.jpeg
IMG_2787.jpeg
IMG_2788.jpeg
IMG_2789.jpeg
Jan 27, 2024
Trim tab
- (4 hours)
Category: Empennage
Wire trim tab servo
IMG_2759.jpeg
IMG_2761.jpeg
IMG_2762.jpeg
IMG_2763.jpeg
IMG_2764.jpeg
IMG_2765.jpeg
IMG_2767.jpeg
Jan 25, 2024
Prep for mock fitting
- (2 hours)
Category: Empennage
Prep for trim tab servo install a final mock up of HS and elevator
IMG_2756.jpeg
IMG_2755.jpeg
IMG_2752.jpeg
IMG_2749.jpeg
IMG_2745.jpeg
IMG_2746.jpeg
Jan 21, 2024
Elevator & trim tab
- (4 hours)
Category: Empennage
Final clean elevator, install trim tab access panel.
IMG_2698.jpeg
IMG_2701.jpeg
IMG_2705.jpeg
IMG_2707.jpeg
IMG_2709.jpeg
IMG_2703.jpeg
IMG_2711.jpeg
IMG_2713.jpeg
IMG_2715.jpeg
Jan 20, 2024
Trim tab servo prep
- (6 hours)
Category: Empennage
Install nut plates and prime and prep access panel for trim tab
IMG_2686.jpeg
IMG_2687.jpeg
IMG_2688.jpeg
IMG_2689.jpeg
IMG_2692.jpeg
IMG_2693.jpeg
IMG_2694.jpeg
IMG_2695.jpeg
IMG_2696.jpeg
Jan 18, 2024
Elevator work
- (8 hours)
Category: Empennage
Finish mount of forward skin, install wire, prep skins for VGs. Remove skins to do final Debur and remove drill tailings.
IMG_2677.jpeg
IMG_2671.jpeg
IMG_2676.jpeg
IMG_2675.jpeg
IMG_2679.jpeg
IMG_2674.jpeg
IMG_2672.jpeg
IMG_2681.jpeg
IMG_2680.jpeg
IMG_2679.jpeg
IMG_2678.jpeg
Jan 16, 2024
Forward elevator Skin
- (3 hours)
Category: Empennage
Mount forward elevator skins
IMG_2669.jpeg
IMG_2668.jpeg
IMG_2670.jpeg
Jan 15, 2024
Rivet Elevator rear skin
- (6 hours)
Category: Empennage
Removed Clecos and skins, disassembled removed drill tailings and deburred match drilled holes. Reassembled and riveted rear skins.
IMG_2631.jpeg
IMG_2636.jpeg
IMG_2638.jpeg
IMG_2639.jpeg
IMG_2643.jpeg
IMG_2657.jpeg
IMG_2667.jpeg
Jan 14, 2024
Cleco Skins
- (4 hours)
Category: Empennage
Clecoed rear elevator skins. Prep and prime doubler, VGs, and horns.
IMG_2633.jpeg
IMG_2626.jpeg
IMG_2631.jpeg
IMG_2632.jpeg
IMG_2625.jpeg
IMG_2630.jpeg
Jan 13, 2024
Assemble Elevator Spar
- (4 hours)
Category: Empennage
Assembled elevator skeleton and prepped and primed skins
IMG_2621.jpeg
IMG_2623.jpeg
IMG_2628.jpeg
IMG_2624.jpeg
Jan 12, 2024
Prep Elevator parts
- (4 hours)
Category: Empennage
Pulled all elevator parts, deburr and prime
IMG_2598.jpeg
IMG_2620.jpeg
IMG_2619.jpeg
Jan 06, 2024
Horizontal Stabilizer fences
- (6 hours)
Category: Empennage
Fabricated an additional stiffener piece, primed all parts and final assembly. Some rivets left out and not riveted to the HS until after elevator is complete.
IMG_2587.jpeg
IMG_2588.jpeg
IMG_2589.jpeg
IMG_2590.jpeg
IMG_2591.jpeg
IMG_2592.jpeg
IMG_2596.jpeg
IMG_2593.jpeg
IMG_2594.jpeg
Dec 25, 2023
Horizontal Stabilizer skin and end rib final Cleco
- (4 hours)
Category: Empennage
Clecoed end rib stabilizers, folded over HS skin and installed end ribs.
IMG_1522.jpeg
IMG_1521.jpeg
IMG_1520.jpeg
IMG_1516.jpeg
IMG_1517.jpeg
IMG_1519.jpeg
IMG_1514.jpeg
IMG_1512.jpeg
IMG_1511.jpeg
IMG_1507.jpeg
IMG_1508.jpeg
IMG_1502.jpeg
IMG_1503.jpeg
IMG_1518.jpeg
Dec 24, 2023
Horizontal Stabilizer end rib stiffeners
- (3 hours)
Category: Empennage
Final prep and initial install of custom end rib stiffeners. Made 4 upper and lower for both sides. With the addition of the Viking end fences I thought it would be a good idea to add them. Probably not necessary but since I'm building and had access thought why not. Will cost a little weight but when installed made quite a difference in stiffness since the front spar does not go all the way to the end rib.
IMG_2424.jpeg
IMG_2423.jpeg
IMG_2422.jpeg
IMG_2419.jpeg
IMG_2418.jpeg
IMG_2417.jpeg
IMG_2416.jpeg
Dec 16, 2023
Horizontal Stabilizer
- (3 hours)
Category: Empennage
Prime skin, end ribs and fences. Final assembly with clecos.
IMG_1488.jpeg
IMG_1487.jpeg
IMG_1486.jpeg
IMG_1485.jpeg
Dec 10, 2023
Horizontal Stablizer
- (9 hours)
Category: Empennage
Finished initial assembly, finished drilling out HS skin top and bottom, disassembled, deburred, and started prep for priming before final assembly.
IMG_2388.jpeg
IMG_2389.jpeg
Dec 09, 2023
Working on HS skin and HS fences
- (11 hours)
Category: Empennage
Fitted HS fences and then mounted. Fitted and drilled HS skin. Also constructed stiffeners from end rib to forward spar rib.
IMG_2386.jpeg
IMG_1483.jpeg
IMG_1482.jpeg
IMG_1479.jpeg
IMG_1481.jpeg
IMG_1480.jpeg
IMG_1477.jpeg
IMG_1478.jpeg
Dec 03, 2023
Horizontal Stabilizer fences
- (6 hours)
Category: Empennage
Spent the day getting parts drilled an filed for the Viking stabilizer fences. Took longer expected… making custom parts a lot harder then just putting Zenith parts together….. hats off to Zenith for making this a doable project!
IMG_1469.jpeg
IMG_1468.jpeg
IMG_1467.jpeg
Dec 02, 2023
Viking STOL fences
- (4 hours)
Category: Empennage
Set geometry for Viking stol winglets on horizontal stablizer
IMG_1466.jpeg
IMG_1465.jpeg
IMG_1463.jpeg
IMG_1464.jpeg
Nov 02, 2023
Horizontal Stabilizer
- (3 hours)
Category: Empennage
Complete assembly of front and rear spar IPL steps 6-8. Sheet SD75-HS-02 complete.
IMG_1409.jpeg
IMG_1418.jpeg
IMG_1416.jpeg
IMG_1412.jpeg
Oct 30, 2023
Horizontal Stablizer
- (2 hours)
Category: Empennage
Assembly on front and rear spars steps 1-5 of IPL. Needed to order #12 drill bit to ream holes in brackets for 3/16 inch rivets. 2 hours.
IMG_1407.jpeg
IMG_1406.jpeg
IMG_1419.jpeg
IMG_1404.jpeg
IMG_1405.jpeg
Oct 29, 2023
Horizontal Stablizer
- (6 hours)
Category: Empennage
Assembled spars and preped ribs etc for HS skeleton assembly. 6 hours total. Sheet SD75-HS-01 complete.
IMG_1397.jpeg
IMG_1398.jpeg
IMG_1394.jpeg
IMG_1396.jpeg
Oct 28, 2023
Horizontal Stabilizer
- (5 hours)
Category: Empennage
Prep front and rear spar parts 5 hours
IMG_1390.jpeg
IMG_1391.jpeg
IMG_1392.jpeg
Oct 18, 2023
PPL
Category: Research
After inventory and shop was complete I focused on finishing out my PPL. Passed check ride on 17 October 2023 just under a year since starting ground school 76 hours total flight time. Total cost $20711.51.
IMG_1355.jpeg
Sep 04, 2023
Workshop ready
Category: Workshop
24.18.48.72+88ZDx7Di0-IMG_1261.jpeg
Aug 28, 2023
Early Parts Order
Category: Avionics
Order of advance G3X parts for airframe. Antenna, pitot tube, etc…
Aug 26, 2023
Work Tables complete
- (12 hours)
Category: Workshop
24.18.48.72+88ZDx7Di0-IMG_1257.jpeg
Aug 18, 2023
Inventory Complete Aug 18,2023
- (16 hours)
Category: Research
107.77.205.49+88ZDx7Di0-IMG_1231.jpeg
Aug 16, 2023
Kit Arrives Aug 16,2023
- (4 hours)
Category: Research
Kit delivery all in cost for 750 SD and shipping $46,453.84
107.77.205.49+88ZDx7Di0-IMG_1228.jpeg
107.77.205.49+88ZDx7Di0-IMG_1229.jpeg
Aug 14, 2023
Viking Engine 195T advanced parts order
Category: Engine
Advanced airframe engine parts, fuel system etc…
Apr 28, 2023
Day 2 workshop Apr 28,2023
- (6 hours)
Category: Workshop
107.77.205.49+88ZDx7Di0-IMG_0969.jpeg
107.77.205.49+88ZDx7Di0-IMG_0971.jpeg
Apr 27, 2023
Day 1 workshop Apr 27,2023
- (6 hours)
Category: Workshop
107.77.205.49+88ZDx7Di0-IMG_0967.jpeg
107.77.205.49+88ZDx7Di0-IMG_1925.jpeg
107.77.205.49+88ZDx7Di0-IMG_1926.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.