Apr 07, 2024     Right Wing - (8 hours)       Category: Wings
Finished initial assembly / mock up of spar and rib assemblies of right wing, disassemble and debur prep for primer.


 
Apr 06, 2024     Right Wing - (5 hours)       Category: Wings
Started initial assembly of right wing


 
Mar 29, 2024     Duc Propeller arrives - (1 hour)       Category: Propeller
Prop arrives inspect and inventory. Expense included in FWF kit.


 
Mar 23, 2024     Start wings - (4 hours)       Category: Wings
Parts search, store HS and elevator. Mock up first page wing plans spar. Wing rack from Gary added wheels.


 
Mar 14, 2024     Engine arrives and FWF kit arrives - (6 hours)       Category: Engine
Receive and inventory engine and firewall forward kit.


 
Mar 11, 2024     EAA Electrical and Avionics - (16 hours)       Category: Workshop
Traveled to San Jose CA for EAA workshop. Was some of the best training I ever received great instruction. March 8-11 2024. Costs with travel $1200.


 
Feb 15, 2024     Engine Sensors ordered - (1 hour) Category: Engine
 
Feb 05, 2024     Viking Worksop - (8 hours)       Category: Workshop
Flew to Florida for Viking Aircraft Engines for the annual workshop and ordered my Viking Honda 195 Turbo.


 
Jan 28, 2024     Trim tab install & final mock up - (12 hours)       Category: Empennage
Install and calibrate trim tab range of motion, complete mock up installation of horizontal stabilizer with end fences, elevator, and trim tab. Fab & Install doubler for trim tab slot in skin due to oil canning. Contact Marv Scott for EAA consult on Tuesday.


 
Jan 25, 2024     Prep for mock fitting - (2 hours)       Category: Empennage
Prep for trim tab servo install a final mock up of HS and elevator


 
Jan 20, 2024     Trim tab servo prep - (6 hours)       Category: Empennage
Install nut plates and prime and prep access panel for trim tab


 
Jan 18, 2024     Elevator work - (8 hours)       Category: Empennage
Finish mount of forward skin, install wire, prep skins for VGs. Remove skins to do final Debur and remove drill tailings.


 
Jan 16, 2024     Forward elevator Skin - (3 hours)       Category: Empennage
Mount forward elevator skins


 
Jan 15, 2024     Rivet Elevator rear skin - (6 hours)       Category: Empennage
Removed Clecos and skins, disassembled removed drill tailings and deburred match drilled holes. Reassembled and riveted rear skins.


 
Jan 14, 2024     Cleco Skins - (4 hours)       Category: Empennage
Clecoed rear elevator skins. Prep and prime doubler, VGs, and horns.


 
Jan 13, 2024     Assemble Elevator Spar - (4 hours)       Category: Empennage
Assembled elevator skeleton and prepped and primed skins


 
Jan 12, 2024     Prep Elevator parts - (4 hours)       Category: Empennage
Pulled all elevator parts, deburr and prime


 
Jan 06, 2024     Horizontal Stabilizer fences - (6 hours)       Category: Empennage
Fabricated an additional stiffener piece, primed all parts and final assembly. Some rivets left out and not riveted to the HS until after elevator is complete.


 
Dec 24, 2023     Horizontal Stabilizer end rib stiffeners - (3 hours)       Category: Empennage
Final prep and initial install of custom end rib stiffeners. Made 4 upper and lower for both sides. With the addition of the Viking end fences I thought it would be a good idea to add them. Probably not necessary but since I'm building and had access thought why not. Will cost a little weight but when installed made quite a difference in stiffness since the front spar does not go all the way to the end rib.


 
Dec 16, 2023     Horizontal Stabilizer - (3 hours)       Category: Empennage
Prime skin, end ribs and fences. Final assembly with clecos.


 
Dec 10, 2023     Horizontal Stablizer - (9 hours)       Category: Empennage
Finished initial assembly, finished drilling out HS skin top and bottom, disassembled, deburred, and started prep for priming before final assembly.


 
Dec 09, 2023     Working on HS skin and HS fences - (11 hours)       Category: Empennage
Fitted HS fences and then mounted. Fitted and drilled HS skin. Also constructed stiffeners from end rib to forward spar rib.


 
Dec 03, 2023     Horizontal Stabilizer fences - (6 hours)       Category: Empennage
Spent the day getting parts drilled an filed for the Viking stabilizer fences. Took longer expected… making custom parts a lot harder then just putting Zenith parts together….. hats off to Zenith for making this a doable project!


 
Dec 02, 2023     Viking STOL fences - (4 hours)       Category: Empennage
Set geometry for Viking stol winglets on horizontal stablizer


 
Nov 02, 2023     Horizontal Stabilizer - (3 hours)       Category: Empennage
Complete assembly of front and rear spar IPL steps 6-8. Sheet SD75-HS-02 complete.


 
Oct 30, 2023     Horizontal Stablizer - (2 hours)       Category: Empennage
Assembly on front and rear spars steps 1-5 of IPL. Needed to order #12 drill bit to ream holes in brackets for 3/16 inch rivets. 2 hours.


 
Oct 29, 2023     Horizontal Stablizer - (6 hours)       Category: Empennage
Assembled spars and preped ribs etc for HS skeleton assembly. 6 hours total. Sheet SD75-HS-01 complete.


 
Oct 28, 2023     Horizontal Stabilizer - (5 hours)       Category: Empennage
Prep front and rear spar parts 5 hours


 
Oct 18, 2023     PPL       Category: Research
After inventory and shop was complete I focused on finishing out my PPL. Passed check ride on 17 October 2023 just under a year since starting ground school 76 hours total flight time. Total cost $20711.51.


 
Sep 04, 2023     Workshop ready       Category: Workshop


 
Aug 28, 2023     Early Parts Order Category: Avionics
Order of advance G3X parts for airframe. Antenna, pitot tube, etc…
 
Aug 26, 2023     Work Tables complete - (12 hours)       Category: Workshop


 
Aug 18, 2023     Inventory Complete Aug 18,2023 - (16 hours)       Category: Research


 
Aug 16, 2023     Kit Arrives Aug 16,2023 - (4 hours)       Category: Research
Kit delivery all in cost for 750 SD and shipping $46,453.84


 
Aug 14, 2023     Viking Engine 195T advanced parts order Category: Engine
Advanced airframe engine parts, fuel system etc…
 