EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ETBVan
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (23)
Research
Workshop
- (5)
Empennage
Fuselage
- (17)
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
- (1)
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
James Seitz
-
Project:
Vans - RV-12iS
-
VIEW REPORTS
Total Hours:
53.5
Total Flight Time:
Total Expense:
N/A
Start/Last Date:
Sep 10, 2023 - Mar 31, 2025
Friendly URL:
https://eaabuilderslog.org?s=ETBVan
Home or Last Project Picture
May 06, 2024
Progress of 05/06/2024
- (2 hours)
Category: Workshop
Installed one of the flight sticks into the Fuselage, then we worked on the tires, worked on the seat backs, and worked on the electrical system and cheeking for leaks in the fuel lines.
20240506_190026.jpg
20240506_190036.jpg
20240506_190129.jpg
20240506_190624.jpg
20240506_191402.jpg
20240506_191936.jpg
20240506_193646.jpg
attachments (7).zip
Apr 29, 2024
Fuselage and Prepping Parts
- (2 hours)
Category: Workshop
Today we worked on the fuselage and installing fans for the electronics up front. We also prepped parts for the tail cone
Apr 21, 2024
Progress Report on day of 04/21/2024
- (3 hours)
Category: Workshop
Today we continued working on the Fuselage and the oil system, as well as the seat backings and flight controls.
IMG_0159.jpeg
IMG_0163.jpeg
IMG_0164.jpeg
IMG_0165.jpeg
attachments (6).zip
Apr 07, 2024
continuation of the build
- (3 hours)
Category: Workshop
torque sealed the fuel system and added fuel lines, continuation of the brake and rudder pedals, working on the battery cage and the oil tank and brake fluid holder, formed the tops skin of the instrument panel.
attachments (5).zip
Mar 17, 2024
Fuel systems and fuselage
- (3 hours)
Category: Fuel System
Continued fuel line bending and installation. Dry-fit fuel tank in fuselage for match drilling before final assembly. Continued with prep for interior cockpit and canopy.
IMG_7487.jpg
IMG_7488.jpg
IMG_7489.jpg
IMG_7491.jpg
IMG_7492.jpg
IMG_7493.jpg
IMG_7576.jpg
IMG_7577.jpg
IMG_7578.jpg
IMG_7579.jpg
IMG_7580.jpg
IMG_7581.jpg
Mar 11, 2024
Misc updates from fuselage section.
Category: Fuselage
Misc updates from fuselage section. New learnings in the areas of fuel tank sealant and fuel lines. Progress continues on fuselage
IMG_4566.jpeg
IMG_2190.jpeg
IMG_4570.jpeg
IMG_2172.jpeg
IMG_2173.jpeg
IMG_2171.jpeg
IMG_2135.jpeg
Feb 19, 2024
Fuel Tank, Fuselage, and Lower Forward Fuselage Firewall
- (2.5 hours)
Category: Fuselage
Today we worked on making sure that the fuel tank was leak seal before completely finishing it up. On the Fuselage side of things we continued riveting the outer skin on. With the lower forward fuselage we stressed the importance of ProSealing the firewall to prevent carbon monoxide leaks into the cabin.
image5.jpeg
image3.jpeg
image2.jpeg
image1.jpeg
Feb 19, 2024
Fuel Tank, Fuselage, and Lower Forward Fuselage Firewall
- (2.3 hours)
Category: Fuselage
Today we worked on making sure that the fuel tank was leak seal before completely finishing it up. On the Fuselage side of things we continued riveting the outer skin on. With the lower forward fuselage we stressed the importance of ProSealing the firewall to prevent carbon monoxide leaks into the cabin.
image1.jpeg
Feb 12, 2024
Fuel Tank, FWD Lower Fuselage, Side Skins, Seat Backs
- (2 hours)
Category: Fuselage
Fresh air vent brackets were prepped, as well as side skins. The side skins used Cherry Rivets... Primed the Longeron, attached nut plates to the firewall. The fuel cell was Pro-Sealed and riveted together. The seat backs were deburred and countersunk.
IMG_7487.jpg
IMG_7488.jpg
IMG_7489.jpg
IMG_7490.jpg
IMG_7491.jpg
IMG_7492.jpg
IMG_7493.jpg
Feb 05, 2024
side skin gas tank seat backs lower fusel loge
- (2 hours)
Category: Fuselage
finish tank
mach drilled side skins
finishing tank
drilled hinges
20240205_183942.jpg
20240205_184151.jpg
20240205_193459.jpg
20240205_193536.jpg
20240205_193559.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.