Project: ETBVan   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:James Seitz   -  
Project:   Vans - RV-12iS   -   VIEW REPORTS
Total Hours:53.5
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 10, 2023 - Mar 31, 2025
 
Friendly URL: https://eaabuilderslog.org?s=ETBVan

Home or Last Project Picture

May 06, 2024     Progress of 05/06/2024 - (2 hours)       Category: Workshop
Installed one of the flight sticks into the Fuselage, then we worked on the tires, worked on the seat backs, and worked on the electrical system and cheeking for leaks in the fuel lines.


 
Apr 29, 2024     Fuselage and Prepping Parts - (2 hours) Category: Workshop
Today we worked on the fuselage and installing fans for the electronics up front. We also prepped parts for the tail cone
 
Apr 21, 2024     Progress Report on day of 04/21/2024 - (3 hours)       Category: Workshop
Today we continued working on the Fuselage and the oil system, as well as the seat backings and flight controls.


 
Apr 07, 2024     continuation of the build - (3 hours)       Category: Workshop
torque sealed the fuel system and added fuel lines, continuation of the brake and rudder pedals, working on the battery cage and the oil tank and brake fluid holder, formed the tops skin of the instrument panel.


 
Mar 17, 2024     Fuel systems and fuselage - (3 hours)       Category: Fuel System
Continued fuel line bending and installation. Dry-fit fuel tank in fuselage for match drilling before final assembly. Continued with prep for interior cockpit and canopy.


 
Mar 11, 2024     Misc updates from fuselage section.       Category: Fuselage
Misc updates from fuselage section. New learnings in the areas of fuel tank sealant and fuel lines. Progress continues on fuselage


 
Feb 19, 2024     Fuel Tank, Fuselage, and Lower Forward Fuselage Firewall - (2.5 hours)       Category: Fuselage
Today we worked on making sure that the fuel tank was leak seal before completely finishing it up. On the Fuselage side of things we continued riveting the outer skin on. With the lower forward fuselage we stressed the importance of ProSealing the firewall to prevent carbon monoxide leaks into the cabin.



 
Feb 19, 2024     Fuel Tank, Fuselage, and Lower Forward Fuselage Firewall - (2.3 hours)       Category: Fuselage
Today we worked on making sure that the fuel tank was leak seal before completely finishing it up. On the Fuselage side of things we continued riveting the outer skin on. With the lower forward fuselage we stressed the importance of ProSealing the firewall to prevent carbon monoxide leaks into the cabin.


 
Feb 12, 2024     Fuel Tank, FWD Lower Fuselage, Side Skins, Seat Backs - (2 hours)       Category: Fuselage
Fresh air vent brackets were prepped, as well as side skins. The side skins used Cherry Rivets... Primed the Longeron, attached nut plates to the firewall. The fuel cell was Pro-Sealed and riveted together. The seat backs were deburred and countersunk.


 
Feb 05, 2024     side skin gas tank seat backs lower fusel loge - (2 hours)       Category: Fuselage
finish tank
mach drilled side skins
finishing tank
drilled hinges


 