EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Daniilbase
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (7)
Research
Workshop
Empennage
- (7)
Fuselage
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Daniil Dumanskii
-
Project:
Zenair - CH 650
-
VIEW REPORTS
Total Hours:
60
Total Flight Time:
Total Expense:
$5070.00
Start/Last Date:
Dec 18, 2023 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Daniilbase
Home or Last Project Picture
Feb 07, 2024
Tail assembly
- (2 hours)
Category: Empennage
Horizontal riveted together. Some holes had to be drilled bigger and riveted as A5 instead of A4. add 2 more rivets in the middle of the hinge. Cut some brocken rivets used die grinder
IMG_3579.jpeg
Feb 05, 2024
Elevator riveted
- (7 hours)
Category: Empennage
final preparation, gol air drill and was able to drill holes inside of the elevator. Install one more L-angle in the elevator, riveted whole elevator.
IMG_3575.jpeg
Feb 03, 2024
Elevator
- (9 hours)
Category: Empennage
Clecoed elevator, pre drilled hinges and installed horns, trim tap is ready as well. It's incredible how much time it took to line everything up. Ordered and ressived air drill. Wings set with cargo compartment, fuel system(long range) was ordered.
IMG_3529.jpeg
IMG_3557.jpeg
Jan 23, 2024
Horizontal are almost done
- (7 hours)
Category: Empennage
Extended work desk, riveted second side of the horizontal stabilizer, drilled and clecoed piano hinge. Plastic ribs are ready for drilling
IMG_3525.jpeg
IMG_3522.jpeg
IMG_3523.jpeg
Jan 17, 2024
Horizontal stabilizer
- (15 hours)
Category: Empennage
Skeleton assembled and riveted, skin riveted on one side. I had to buy extra clecos(150$), extra lumber, retchets, lavel, clumbs, compressor and 2 rivet guns, fittings
IMG_3507.jpeg
IMG_3501.jpeg
IMG_3508.jpeg
Jan 17, 2024
Rudder finished
- (17 hours)
Category: Empennage
Rudder finished. I had to build workbench and buy all the tools. I visited Brian for some help with rib aliment. Rudder turn out good but not perfect.
IMG_3503.jpeg
IMG_3398.jpeg
IMG_3341.jpeg
IMG_3323.jpeg
IMG_3322.jpeg
IMG_3320.jpeg
Dec 18, 2023
Rudder
- (3 hours)
Category: Empennage
Rudder kit, tools and bench materials
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.