Project: thall_S-6S   -  
            Last 10 Project Activities / Entries :
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Thomas Hall   -  
Project:   Rans - S-6S Coyote II   -   VIEW REPORTS
Total Hours:42
Total Flight Time:
Total Expense:$14000.00
Start/Last Date:Dec 29, 2023 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=thall_S-6S

Home or Last Project Picture

Mar 09, 2024     Aft Baggage Door & Misc Issues - (5 hours)       Category: Fuselage
Completed aft baggage compartment and door. Drilled and installed rudder stops, ground down rivets, Installed missing washers and bushings on rudder pedals and empenage cables. Installed push pull cotter pins.


 
Feb 15, 2024     Rudder - (3 hours)       Category: Empennage
Installed rudder and rigged cables from pedals to rudder.

Issues found: Missing spacers, nuts, and washers on rudder pedal connections and rudder connections. Rudder stop not drilled.


 
Feb 11, 2024     Stabilizers & Elevators - (4 hours)       Category: Empennage
Inspected horizontal stabilizers, elevators, and push/pull tube. Mounted horizontal stabilizers and elevators. Connected push/pull tube to elevators.

Issues Found: Missing several 3/16" washers, wrong bolt in bottom aft cable tab on left side.


 
Feb 10, 2024     Control sticks, Aileron rigging, Veritical stabilizer - (6 hours)       Category: Fuselage
Checked install of control sticks, aileron rigging, vertical stabilizer. Installed antenna mounting plate.

Issues Found: Push pull tube cotter pins not done, aileron rigging pulley mounting nuts loose, rivet stems protruding on vertical stabilizer, S5 stringer brace missing a center rivet.


 
Feb 09, 2024     Tailcone & Baggage Area - (3 hours)       Category: Fuselage
Finished inspection of tailcone, washed baggage area and reinstalled in airframe.

Issues found: Missing fuel line hose on cross cables at station 4 & 5. Need new piano hinges for baggage area access door.


 
Feb 05, 2024     Rudder, Firewall, Tailcone - (3 hours)       Category: Fuselage
Finish inspecting build and parts or rudder pedals, firewall including formers, started inspection of tailcone structure.

Issues Found: Steel rivets sheared off on rudder pedal swivel brackets, and missing rivets in formers.


 
Feb 04, 2024     Dissassebly Interior - (4 hours)       Category: Fuselage
Removed interior panels, firewall, baggage areas. Wiped down cleaned remaining tubing on cage. Started inspecting prior build work with manuals. Inspected nose gear, nose gear disconnect, nose gear dampener, nose wheel steering linkages, and floorboard.

Issues found: Nose wheel steering linkages installed upside down.


 
Jan 27, 2024     Cleaning - (4 hours)       Category: Fuselage
Removed firewall and finished cleaning and wiping off 20 years of dust from fuselage. Wiped every surface, used baby wipes.


 
Jan 06, 2024     Built Workbenches       Category: Workshop
Built workbenches


 
Dec 30, 2023     Cleaning & Hanging - (5 hours)       Category: Workshop
Wiped down Wings, ailerons, flaps, spars, stabilers, elevators, and hung up on walls to organize.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.