EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
cwellen
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (5)
Research
Workshop
Empennage
Fuselage
Firewall
Tail Feathers
Wings
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
- (5)
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Christopher Wellen
-
Project:
Bearhawk - "B"
-
VIEW REPORTS
Total Hours:
23.5
Total Flight Time:
Start/Last Date:
Apr 17, 2024 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=cwellen
Home or Last Project Picture
May 01, 2024
Fuel tanks
- (7.7 hours)
Category: Fuel System
Assembled and riveted Tank 2
IMG_6770.jpeg
IMG_6771.jpeg
Apr 29, 2024
Fuel tanks
- (3.0 hours)
Category: Fuel System
Finished riveting in tank 1 baffles, riveted on tank top skin
IMG_6768.jpeg
IMG_6769.jpeg
Apr 22, 2024
Fuel tanks
- (7.3 hours)
Category: Fuel System
Finished cutting and forming tank baffles and end caps, drilled and riveted in the end caps for tank 1, drilled in tank 1 baffles and top sheet.
IMG_6765.jpeg
IMG_6766.jpeg
IMG_6767.jpeg
Apr 18, 2024
Fuel tanks
- (4.0 hours)
Category: Fuel System
Finish cut and bent tank skins, started bending tank end caps and baffles.
IMG_6764.jpeg
IMG_6763.jpeg
Apr 17, 2024
Fuel tanks
- (1.5 hours)
Category: Fuel System
Cut out form blocks, rough cut baffles and tank sides
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.