Project: DaveBellairs     -     Entry

Nov 19, 2020 4 FAB alternate air door Category: Firewall
Struggled with the Sam James FAB and installing the alternate air door. Decided I need to build up the aft side of the back plate to ensure alignment with the injector ring. Also made initial cutout for the alt air door. Spent too much time trying to decipher the poorly written instructions on door spring installation and operation. Think I have a plan now to reconstruct to door above the lower hinge and seal with RTV.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.