Spent a lot of time reading installation instructions for the Advanced Flight boxes I received. Got some good input from the folks on VAF and installed the ADHRS on the bracket I had previously installed at one of the rear bulkheads. Got a draft from Evoke/plane schemers that I feel is pretty close to final. Spent a short amount of time sanding down the spots where I filled the forward holes on the cowling for the hinge pins.