Completed installation of oil temp control cable and installed control arm to butterfly valve. Checked for full travel and applied torque seal to pass through bolts. Installed nut plates to F-746 fwd engine control bracket for adel clamps that will secure the engine control cables. Match drilled F-746 to lower portion of the subpanel and clecoed in place. I then installed the subpanel and adel clamps for the cables. Still not sure about the throttle cable as it is still too taught to reach an Adel clamp on the F-746 bracket. Called in to Vans to try and resolve and will update later. Installed the engine sensor wires to the SV-EMS to verify clearance with the connectors and it looks good.