Project: DaveBellairs     -     Entry

Jul 20, 2023 2 Finished tubing runs Category: Avionics
Installed the two remaining brackets and ran the corrugated tubing to the aft fuselage. Cut a piece of the AOA tubing from the wing and ran it aft. Also ran the static line forward for the standby EFIS. On a side note, I dropped the manual pull riveter on the floor of the fuselage and left a nice dent. Hoping the paint shop can work that out.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.