Project: DaveBellairs     -     Entry

Nov 19, 2023 .5 Power cable pass through Category: Engine
Drilled out the power cable firewall pass through to enable the installation of #4 and #6 snap bushings. Installed, crimped and insulated a ring terminal for the end connecting to the ACM. Routed the cable from the master solenoid to the ACM.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.