Cut to final length the B&C voltage regulator #3 wire and connected it to power on the shunt. Had to change out the smaller snap bushing as it was too large to slide into the 1/2” #6 bushing. Connected the engine ground cable from the engine block to the firewall using a location for a through bolt near the oil filler tube.