EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Whammdyne1
- Entry
Date:
Dec 16, 2020
Hours:
2.5
More actuator work. Finished tube fabrication
Category: Wings
Description:
Installed the aileron bellcrank for the left wing. The long torque tube is initially 94 7/16” and the bellcrank to aileron is 25 1/4”, both C-C at the rod end bearings.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.