Project: Whammdyne1     -     Entry

Nov 27, 2022 58.9 Fuselage, Baggage area, door and floorboards Category: Fuselage
This is essentially a catch up entry for my ongoing work. I'm about ready to start installing the cabin cover.

I did customize my baggage door to install a magnetic reed switch to provide a "door open" alert on the G3X, along with the two main cabin doors.

Doing the forward rivets on the front floorboards was a physical challenge for this large human being, but I got through it.