Project: Jill's_WaiexB     -     Entry

Jul 08, 2023 9 Right Wing - Root Doubler, Tip Rib Category: Wings
Finished drilling the root ribs, installed the root doubler, Installed the tip Rib, and finished off by updrilling all of the holes in prep for deburing, dimpling and riveting,


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.