Project: wcooper     -     Entry

Oct 02, 2020 Step Installation Category: Fuselage
Installed the Steps and Inspection Panels in the Baggage Compartment Floors. Drilled Pilot Holes for a socket access point in the bottom of the Fuse and the Baggage Compartment Floors above the securing bolts. Then used a step drill bit to enlarge to 3/4". I'm using a plastic plug to seal the bottom hole.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.