Mar 11, 2021 Baggage Door Category: Fuselage
Jumped ahead a bit. Section 34, Baggage Door. Waiting for some help to rivet the Tailcone to the Fuse. So I thought that I would get to work on the Baggage Door. Match drilled and deburred and dimpled all the parts. Primed and it's pretty much ready to rivet. I purchased a lock and some door seal material. The lock latch was slightly long so used the belt sander to trim it to a better size. I need some help to help hold and stabilize the door to rivet it. I used a metal ruler with holes that I pre-drilled as a jig to drill holes in the piano hinge. Made drilling and spacing the holes very easy.