Project: wcooper     -     Entry

Apr 07, 2021 Sec. 33 Baggage Area Category: Fuselage
Started on Sec. 33. The Baggage Area floors are already dimpled and drilled with the Quick Build Fuse. Earlier, I had cut an access panel in each of the floor panels. I'll also make an access panel under the rear seat floors. Today I cut the Lower Rear Seat Hinges, including removing two center eyes on each hinge so as to make the hinge pins removable. This same method will be used for the baggage door hinge. Then clecoed the floors into place. Also match and final drilled the baggage door frame seal parts. I plan to run wires prior to the final riveting.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.