Project: wcooper     -     Entry

May 26, 2021 Static Line Run Category: Avionics
Got the preliminary run of the static line today. Had to crawl up into the tailcone and over the autopilot servos. I'm running it up the left side as I plan an alternate static port switch on the left side of the instrument panel. The challenge here is trying to decide what ribs or bulkheads I can make additional holes in. I found two in the upper end of the 2 ribs directly over the wing spar. I ran the Static Line through the upper hole in each rib and plan to run the Battery Cable in the lower holes.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.