Project: wcooper     -     Entry

May 05, 2023 PlaneAround Door Mechanisim Category: Doors
I'm working off several different plans at the same time. Van's original, PlaneAround for the latch mechanism and AeroSport for the door handle. On the list today from the PlaneAround instructions, was to cut the Gear Racks that Van's supplied in half, giving four 5 inch racks. This installation is a bit different than how Van's has it. Then remove the cover off the gear box and determine where to match drill and countersink the holes. To secure the structural fiberglass blocks, I used some packing tape and wrapped the gear box, then mixed some Cab-O-Sil and epoxied them into place. That was it for the day, as I wanted the epoxy to set up before I messed with it any more.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.