Kriya helped me lift the fuselage center section back in place so yesterday I reinstalling/clecoed everything back together. Today I started riveting some of the substructure together, including the gear webs, floor stiffeners & got about 1/2 way done with the aft baggage floor ribs to the aft baggage bulkhead.
Something cool that I noticed this afternoon was that with everything clecoed together, the tailcone is actually hovering about 3/8" above the saw horse I had back there. It's totally cantilevered from the fwd and center sawhorses. Really cool.