Project: TerryS     -     Entry

Feb 20, 2024 3 tightened all fuel fittings Category: Fuel System
Some of the fuel line fittings were just finger tight as I positioned and finalized routings and wiring and so forth, so after I finish the fuel vent tank to fuselage plumbing I went back and put a wrench on every fitting to confirm that they were all tight. as I checked each one, I put a stripe of torque putty at that location to signify that it was tightened.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.