Jan 14, 2021 3 Prep for Firewall install Category: Final (X)
Finished all tasks that needed complete prior to installing FW. Rudder pedal brake pivot bolts needed to be longer AN3-7 instead of AN-6 as noted in assy. Manual. Ensured all routing of brake lines were correct. Tweaked covers a little more and installed boost pump plate. Also spent time measuring FW penetrations on N917X so I could drill prior to installing FW.

Large shipment arrived from Glasair so I can move forward with finalizing installation of FW.

Also received my tuned exhaust from GA along with resin materials.