Finished u Garlock trimming and install with both LWR and UP Cowlings. Still need to tweak the LH plenum Garlock just a little but its 98% done! I am missing the Magneto ports and tubing....I'll see if I can add those to the order from GA prior to it shipping this week. Even though I am not using traditional Magnetos, I still need cooling tubes based on the installation instructions from E-Mag