Aug 14, 2021 2 Install forward tunnel covers Category: Final (X)
Nut plates came in from ACS so I spent a few hours drilling and installing all the nut plates and finishing the install of the tunnel covers. I'll paint the heads of the screws black at some point. I also installed the floorboards with longer screws and fender washers to distribute some of the load. I need to source floor mats that will be placed over the floorboards and also paint these.