Jun 03, 2022 5 Some QB fixing to do Category: Fuselage
The fuselage was a QB that had a few things to fix over this build. The latest was removal of the rivets that will hold the steps on each side of the aircraft. Also, I had to drill out rivets and place rivnuts on the aft section.

Luckily, I notice the need to make these changes before I started painting the lower half of the fuselage