EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
WoodysSportsman
- Entry
Date:
Nov 21, 2023
Hours:
2
Installed Stick Grips
Category: Finish
Description:
Installed the stick grips on the control sticks.
This required removing material from the inside at the base of the grips due to the bend in the tube.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.