Project: Serg     -     Entry

Oct 21, 2019 2.3 Stick carrier Category: Controls
Finished installing stick carrier, and connected to primary elevator pushrod. Nut and bolt clearance inside stick carrier was very tight and required cutting and drilling bolts to custom length. I am very happy with the outcome.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.