Project: Serg     -     Entry

Dec 30, 2019 3.7 Elevator Category: Empennage
We have control continuity! Installed elevator pushrod and connected both elevator halves. Everything lines up perfectly, and elevator control moves freely. Extremely happy with this result. Began installing elevator trim torque tubes, linkages, and cables.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.