Project: CH750-SR     -     Entry

Jul 29, 2020 2 Elevator Category: Empennage
Reassembled for final riveting. Fattened WRONG hole of an L angle tab that connects the spar with the port elevator end rib. Simply drilled another rivet hole enough below to work. Painted elevator hinges to inhibit corrosion. Riveted skeleton. Riveted wire to front spar.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.