Project: MartysRV14A     -     Entry

Aug 13, 2021 1 A/C install Category: Air Cond
Riveted boot to flange with LP4-4 and attached hose end. Fed assembly through aft fuselage and clecoed to louver cover and skin. Tested two options for flush pop riveting using a BSC-44 and an MK-319-BS through sandwiched layers totaling 0.1". The MK-319 requires a smaller countersink and leaves a better appearance.