Project: MartysRV14A     -     Entry

Dec 20, 2021 3 Pre-First Flight Preparation Category: Pre-Flight
Repacked nose wheel after having some concern for binding during low power taxi. Removed nose wheel and fork. Cleaned and sanded shaft and bearing with 320 grit. Applied blue marine grease to both bearing faces and reinstalled with new Belleville washers. Tightened nut until force of 26 lbs as measured with spring scale was required to move fork. Drilled new holes and installed Cotter pin.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.