Project: Lance's_650B     -     Entry

Mar 21, 2020 8 6W1-3,1,6,3 - Right Flap align and drill ribs, skin, and control Category: Wings
Built up inner rib that has the control plate. Used scroll saw to more effect this time, then filed. Riveted the control plate on. Strapped the flap down first this time....worked muuuuch better. Drilled, Updrilled, then updrilled again for final hole drill size on both size and spar side. Tomorrow I figure I'll do the hinge work and then disassemble for debur and corrosion.

Good time to be working on this since we are all holed up with the COVID-19 (corona virus) thing going on around the world/country/city. Just a little worried how we'll pic up the fuselage kits in April (10th). We originally were going to pick it up this last Friday (3/20/2020) however on the side of caution, postponed due to Kevin had a cold (he was fairly certain). Just to be safe so I don't bring home ANYTHING to my father-in-law (in-house) who is nearing surgery for a replacement hip, is 84, has COPD, and is a prime candidate to catch that thing Been working from home all week thus far. Hope this ends sooner rather than later though it doesn't look like it.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.