Dec 29, 2017 2 6T1-1 - Level and final drill horizontal stab top Category: Empennage
After strap-down and leveling, final hole (A4) drilled out top of horizontal stab.
Also placed end ribs (6T1-1) an final drilled them (both top and bottom of stab).
Un-cleco'd and re-opened the top so I can debur and apply zinc chromate (corrosion control).