Project: BearhawkZoo     -     Entry

Oct 15, 2020 1.5 Misc fabric tasks Category: Fabric Cover
I painted the aluminum that backs the fabric around the gear legs, and also brushed glue in all the grooves along the sides both in the baggage compartment and between the right lower longeron and right side fabric. I also used JB Weld to attach the left side access frame at the tail and ironed on the right side round forward access frame for the tail's forward spar. I located it to be somewhat centered between the upper stringer and upper longeron so that the spar carry-through will be somewhat centered in the hole. This allows an opening big enough to get my hand in when the carry-through is not in place so that I can connect the trim cables when needed.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.