Project: Mike     -     Entry

May 23, 2021 10 Slow progress, big life changes! Category: Empennage
I took a new job and things have been a little crazy for the past few months which means the build has been on the back burner. Before that the old job got very busy with a lot of time away from home which left little time to build. I managed to sneak in a few hours to finish up mocking up the right side horizontal stabilizer before shelving the project for a few months to head off to training for the new job.

Pictures show the final drilling and fitting of the interior ribs for the RH HS. This is quite a complicated area with lots of parts, lots of holes and eventually a lot of riveting to be done. I thought it would go as smooth as the left side but it actually didn't fit together as well and took some work to get all the parts an pieces lined up and drilled.

Final few pics show the the entire RH HS drilled, cleco'd and assembled.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.