Project: FloMoSlingTSi     -     Entry

Jan 15, 2020 2 HS Finished Dimpling Category: Empennage
Finished dimpling the HS ribs - specifically those that required using the hand squeezer for difficult to reach holes with DRDT-2. Had to grind down the dimple dies more and grind down the lower edge of the hand squeezer so that it would not mar the inside wall of the smaller rib parts. Ground it down for the same clearance as the lower dimple die.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.