Project: FloMoSlingTSi     -     Entry

Apr 12, 2020 3.5 RD Structure Category: Empennage
Got all of the parts back from paint shop after priming on Friday. Assembled and riveted rudder structure. Had to ream out a few holes on the top rib to get the counter weight to align with the 4.8mm rivets. Everything else went together easily.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.