Project: FloMoSlingTSi     -     Entry

Jun 23, 2023 2 Canopy Retaining Strips Category: Fuselage
Added the metal retaining strips to the inside of canopy joggle. Spent some time confirming in plans and other builders that the front three holes get countersunk on canopy to 4.0mm and the fuselage side skins dimpled (top row holes 11-13 counting from the front).

Also with the parachute option there is a pre-drilled hole on the fuselage skin that looks like it does not get a rivet since the parachute cable in the canopy would interfere.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.