I mostly finished the avionics inventory with the exception of the big items which are still in boxes in the guest room. They're going to stay there to be covered by homeowners insurance rather than take them to the hangar. I used TOOL-00005 to drill the mounting holes, then cut the wires on the CPU FAN to length and added connectors, using the ground (black) to connect to one of the screws. I'm not sure on the orientation of the crews but the plans list the parts in order which puts the nut on the to. I'll investigate that a bit. I can always change it.
I also made a spreadsheet of the inventory list in Excel so that I can update the storage location and installation status and search the file alphabetically. I spend a ridiculous amount of time searching packing lists during construction.
Oh, one thing I discovered during the inventory is I did not order the $600 powder coated and labelled instrument panel covers. I've contacted Van's to see if I can send the blanks back and spend even more money.